BLG TECHNOLOGIES / CUSTOMER STORY

How BLG built a software project with two people.

BLG used Prinevo’s agents to plan, build, review and test the project. A shared context layer kept the agents aligned. A learning layer helped retain useful feedback for future work. Two people guided the work and made the key decisions.

Completed in six weeks, including setup, review and QA.

DELIVERY RECORDBLG × PRINEVO
Delivered with Prinevo
6weeks
2people
Estimated baseline12–14 weeks · 4 people
Included in the six weeks Setup + development + review + QA
WHAT THE TEAM BUILT↘
01Identity & accessPermissions
02Document workflowsRouting
03Approvals & signaturesDecisions
04Search & reportingVisibility

The main work areas in BLG’s project plan.

01 / THE PROJECT

A small team.
A project with several moving parts.

The project covered user access, document handling, approvals, digital signatures and reports. The team needed a way to plan the work and check that these parts worked together.

A

Who can do what?

Set who can see, change or approve a record.

B

Where does work move?

Track incoming documents, files and messages.

C

What needs approval?

Connect approvals and digital signatures to the files.

D

What can people see?

Show each user only the records they are allowed to see.

PROJECT PLAN / CAPTURED DURING DELIVERY
Project phase record showing six of eight phases complete, reporting in progress and integration work not yet started
BLG’s project plan The work was split into eight phases. Each phase linked to its tasks and documents. This screenshot was taken during delivery, with six phases complete.

02 / HOW THE TEAM WORKED

People guided the work.
Agents helped deliver it.

Prinevo brought the work into one place. The team could review the plan, talk to the agents, give feedback and approve key steps as the project moved forward.

THE HUMAN TEAM

Decide what to build.
Review the important steps.

  • Explain what the feature should do.
  • Review the requirements and design.
  • Give feedback, answer questions and approve the next step.

Two people worked on the project. Their individual hours were not recorded in this comparison.

THE AGENT TEAM

Plan, build, review
and test the changes.

  • Turn the request into a design and a work plan.
  • Write code and tests, then send the changes for review.
  • Review the code. Run QA in a sandbox. Show the results.

Each agent used the requirements, decisions and feedback from the earlier work.

SHARED CONTEXT LAYER

Business rules · Requirements · Design decisions · Code knowledge · Review feedback

Every agent uses the same project knowledge.
RequirementsArchitecture & planImplementationCode reviewQA in a sandboxHuman decision

Code review and QA can send issues back to the coding agent. People can review the work before it moves to the next stage.

03 / CODE REVIEW AND QA

Writing the code
was one part of the work.

The code review agent checked the changes and returned issues for correction. The QA agent used the same requirements to test the feature. The team could see the findings and results alongside the work.

EXAMPLE PRINEVO RUN
Sample repository delivery run showing parallel implementation completed, code review completed, verification working and deployment planning queued
This sample run shows separate backend and frontend tasks, completed code review and QA still running. It illustrates the workflow. It is not BLG’s final test report.
01

Work on several parts together

Agents handle the API, backend checks and frontend as separate tasks within the same run.

02

Pass useful feedback to QA

The reviewer asks QA to check success, empty and error screens after reporting its test and build checks.

03

See what still needs doing

The team can see that QA is running and release planning is waiting.

QA IN A SANDBOX

Test the change.
Fix the issues. Test again.

Prinevo’s QA agent starts the app and services in a sandbox, a separate environment for testing. It checks the feature against the requirements, including how the frontend, APIs and other services work together.

01 / TEST

Test the important flows

Check the APIs, screens and services that the change affects.

02 / FIX

Send issues back to the coding agent

QA shows what failed. The coding agent fixes it. QA tests it again.

03 / REVIEW

Show the team what was checked

Keep the test results, logs and screenshots with the work. Show what could not be tested.

04 / SHARED CONTEXT AND LEARNING

Shared context for this change.
Learning for the next one.

Prinevo keeps project knowledge and learning in two connected layers. One gives agents the information they need now. The other turns useful feedback into improvements the team can review and reuse.

CONTEXT LAYER

What the agents need to know

Keep the business rules, requirements, design decisions and code knowledge together. The coding agent, reviewer and QA can all use them.

Less time explaining the same project again.

LEARNING LAYER

What the next run should keep

Review feedback from people, code review and QA. Save useful decisions in context. Update agent skills or tests when the way of working needs to change.

Useful feedback carries into future work.

WHAT SHARED CONTEXT MEANS

Take a report with access rules.

The coding agent needs to know which records each user can see. The reviewer needs that rule to check the code. QA needs it to test with different users. They all use the same business rule.

An example based on the reporting work in BLG’s plan.

HOW THE TWO LAYERS CONNECT

Save the rule.
Improve the check.

For the reporting example, save the agreed access rule in the context layer. If a correction shows that QA needs to check another user role, review an update to the QA skill or tests through the learning layer.

The next run can use both the business rule and the improved check. Learning changes the shared setup after review.

How feedback becomes learning ↗

05 / THE RESULT

Six weeks.
Two team members.

BLG completed the project in six weeks with two team members. That included setup, review and QA.

The original estimate was 12–14 weeks with four people. The figures below compare the actual delivery with that estimate.

50–57%

Less delivery time

Compared with the original 12–14 week estimate.

50%

Fewer team members

Two team members, compared with four in the estimate.

6 weeks

Including setup, review and QA

Setup, development, review and QA were included.

Estimated baseline and actual delivery
MeasureEstimated baselineWith Prinevo
Elapsed delivery time12–14 weeks6 weeks
Team size4 members2 members
How we calculated the numbers

Time saved against the estimate is (12 − 6) ÷ 12 = 50%, or (14 − 6) ÷ 14 ≈ 57.14%. That gives a range of about 50–57% less delivery time.

The team size fell from four people in the estimate to two in the actual project, a 50% reduction. This does not tell us the hours worked or cost saved. The comparison uses figures supplied by the project owner, not a separate trial or independent audit.

These figures compare an estimate with one completed project. They do not measure production reliability or how much later runs improved.

TRY IT ON YOUR OWN WORK

What could your team
deliver with Prinevo?

Bring one real change. See the agents plan, build, review and test it. Your team guides the work and reviews the results.

Source image

Original source image. Scroll horizontally to inspect detail on smaller screens.